WellSpan York Hospital Surgical Tower
Pouring New Life into Healthcare
In June 2024, WellSpan York Hospital—a Level 1 trauma center serving a large population in South Central Pennsylvania—began construction on a new surgical tower. This space will include 96 ICU beds, 21 operating rooms, 70 prep/recovery and postanesthesia care unit bays and a 15,000-square-foot central sterile processing department.
Given WellSpan’s commitment to sustainability, they prioritized sourcing materials and labor locally for this project. In fact, more than 80% of the contractors are from the immediate area, helping to reduct the project’s carbon footprint while also supporting the local economy. As part of this local team, Kinsley Materials is supplying over 17,000 cubic yards of concrete for the footings, walls, floors, slabs-on-grade and pier columns throughout the project.
A Solid Foundation for Saving Lives
While delivering concrete is routine for the Kinsley Materials team, contributing to a project that lays the foundation for saving lives is a unique opportunity. Once completed, the 248,000-square-foot expansion will bring the hospital’s capacity to over 600 beds, making it one of the largest in Pennsylvania.
To meet the specific needs of this ambitious project, Kinsley Materials is supplying at least four concrete mixes. Some of the mixes are standard for building construction, but one is a temperature-sensitive mix designed specifically for the fivefoot- deep footer pours. Because deeper pours take longer to cure, it’s crucial to maintain the correct temperature to prevent defects in the concrete.
With more than 200 scheduled deliveries for this complex project, quality control is paramount. Before delivery, each load of concrete will be tested for temperature, air content and slump. Strength tests will ensure the concrete meets the necessary standards. Additionally, once the concrete is poured, a third-party tester will be on-site to monitor and test the concrete as it cures.
A Team Effort
As the project moves toward completion in spring 2025, we’re incredibly proud of the work our team has accomplished so far. From our dispatchers keeping operations seamless and our drivers navigating tight job sites to our lab techs ensuring exceptional quality and engineers developing custom concrete mixes, every member of our team has been vital to the process. Together, we’re building the future of healthcare in our community. We look forward to continuing our partnership with WellSpan and other local collaborators to make lasting improvements in York County.
Recent Posts

High Voltage, Higher Impact: Supporting the Region’s Most Complex Infrastructure
Since its inception in 2006, Kinsley’s rebar operations have evolved from a local York, Pennsylvania, facility into a specialized powerhouse.

Expanding Capacity at the Filler Plant
Since its inception in 2006, Kinsley’s rebar operations have evolved from a local York, Pennsylvania, facility into a specialized powerhouse.

Raising the Bar at Materials’ Rebar Shop
Since its inception in 2006, Kinsley’s rebar operations have evolved from a local York, Pennsylvania, facility into a specialized powerhouse.